- Home
- Services
- Engineering
- Town Capital Improvement Projects
Town Capital Improvement Projects
-
Paving and Drainage Projects
Pave numerous roads and portions of the Legacy Trail around town as well as repair recent storm damage.
-
Downtown Railroad Pedestrian and Bicycle Crossing Feasibility Study
This Study is the initial step in assessing the technical, financial, and political feasibility of a new at-grade or grade-separated (i.e. over or undercrossing) railroad crossing to improve and enhance accessibility, connectivity, and safety for pedestrians and bicyclists in central Downtown Truckee.
-
Jibboom Street Sidewalk Feasibility Study and Improvement Project
Prepare a study to evaluate potential pedestrian / bicycle improvements on Jibboom Street between Bridge Street.
-
Pioneer Trail and Bridge Street Extension Project
Construct a new access road linking Tahoe Donner SR 89 North / SR 267 via an extension of Pioneer Trail.
-
Reimagine Bridge Street
The Reimagine Bridge Street project encompasses intersection improvements on Bridge Street at Donner Pass Road and East/West River Streets.
-
Riverview Sports Park Trail Connection
The goal of this project is to connect the existing Truckee River Legacy Trail and Joerger Ranch Trail.
-
Trout Creek Restoration Project
Restore Trout Creek from its I-80 undercrossing east of Bridge Street, under Donner Pass Road.
-
Truckee River Legacy Trail
Construct a Class 1 asphalt trail between Brockway Road and West River Street / 89 South intersection.
-
West River Site Project
The West River Site redevelopment will be a mixed use project along the Truckee River in downtown Truckee, featuring a riverfront park and river-oriented commercial offerings
-
West River Street Streetscape
Installation of sidewalks, curbs, gutters, crosswalks, ADA accessibility, landscaping, lighting, utility.